Lostock energy plant to begin six months of piling work as part of its construction
THE next stage in the construction of the controversial Lostock Sustainable Energy Plant (LSEP) will begin on Monday (September 20). Located at the Lostock Works, once built and operational LSEP hopes to burn at least 600,000 tonnes of residual